I · ABOUT One yard on one stretch of the Tuzla waterfront
GET IN TOUCH info@revivarefit.com
THE YARD Evliya Çelebi Mah. Tersaneler Cad.
No 6, Tuzla, Istanbul
2015 2015 2016 2017 2017 2018 2018 2020 2021 2021 2023 2023 2024 2024 2024 2024 2026 2026 2027 2027 TODAY
PROJECT HISTORY EVERY HULL, IN ORDER

A yard's record is not what it says about itself. It is the list of hulls that left it and stayed at sea. This is ours, in the order the water took them back.

SCROLL TO WIND IT BACK
M/Y Y, the first yacht on the Reviva refit register, after her 2015 refit
REWINDING 2026
TUZLA · 2015 This is where the register starts.
2015 — 2018 The First Campaigns
Y
R04 · 32 M · EX REINA POL 2015

Y

A 2011 hull, twelve months from the autumn. Structure and finish taken together, with the interior drawn by Guido de Groot Design. The first entry on the register.

St Nicholas
R03 · 42 M · STEEL EXPLORER 2016

St Nicholas

A Ukrainian-built steel explorer of 2007, four hundred gross tonnes. A winter on the hard, a full technical refit, and back into class.

Beluga
R07 · 34 M · EX SHIPOWNER 2017

Beluga

Twelve months on a 2003 sailing yacht — and two metres added to her length while she was open.

R06 · 26 M · FIRST OF TWO 2017

Saadet Sultan

Thirteen months through the winter on a 1989 hull: structure, modern systems and a full re-finish. She would come back.

Belvedere
R08 · 34.7 M · WOODEN EPOXY 2018

Belvedere

Eight winter months on a 2005 wooden-epoxy motor yacht, thirteen years after her launch. Every detail attended to, none of it hurried.

L'Aquila
R10 · 35.2 M · SAIL 2018

L'Aquila

Ten months over the winter on a Ginton-drawn sloop of 2005. Rig, deck and systems returned to class and redelivered.

2020 — 2023 Longer Stays
Iceberg
R14 · 27 M · EX SELEDA 2020

Iceberg

A 27-metre hull of 2015 in wooden epoxy laminate, back on the hard five years after she was new.

1453 Istanbul
R09 · 35 M · DELIVERED AS MIRAÇ 2021

1453 Istanbul

Six months over the winter at Pendik: structural modification, the interior rebuilt, and a new name on the transom.

R12 · 40 M · PRINCESS 2021

Solaris

A 2014 Princess, the first of two campaigns. Deck and interior taken on one programme rather than in sequence.

Isra
R05 · 32.9 M · EX DEBORAH 2023

Isra

Seven months through the autumn on a 2008 Sunseeker. Interior and exterior worked at the same time, by the same foremen.

Saadet Sultan
R06 · SECOND CAMPAIGN 2023

Saadet Sultan

Six months, six years after the first. The same 1989 hull, and a record that picks up exactly where the last one closed.

2024 Four in a Year
Grand Rusalina
R11 · 60 M · LARGEST REDELIVERED 2024

Grand Rusalina

Sixty metres, six months over the winter, four and a half of them in dry dock. Interior, propulsion and coatings in one campaign.

Solaris
R12 · SECOND CAMPAIGN 2024

Solaris

Five months in the spring: teak decks replaced and the interior modified, to drawings by Mark Berryman.

Zima
R13 · 23.1 M · BUILT 2023 2024

Zima

Three months on a yacht barely a year old — a spa pool in the bow, more underwater lighting, and the interior door mechanisms reworked.

Hayat
R02 · 22.3 M · SHORTEST STAY 2024

Hayat

One month in the spring on a 2009 Sunseeker. The shortest stay on the register, and everything performance and safety needed inside it.

2026 — 2027 In the Yard
Mirabella
R15 · 47.9 M · TRINITY 2026

Mirabella

A 47.9-metre Trinity of 2004 taken back to bare substrate: exterior repaint, sundeck rebuilt, class survey closed — and redelivered on the date agreed at signature.

Serenity II
R17 · 40 M · IN SHED TWO 2026

Serenity II

A 40-metre laminated-epoxy hull of 2010. Interior rebuilt in full, new AV and lighting looms, galley and crew mess reconfigured. Redelivery winter 2026.

43 M · CONFIDENTIAL · IN DRY DOCK 2027

R16

Awlgrip to bare substrate, the sundeck rebuilt around a new spa pool, tenders and davits renewed. The name is published when the owner says so. Redelivery spring 2027.

Sea Cloud
R18 · 109.93 M · BARQUE OF 1931 2027

Sea Cloud

The longest hull ever taken in here: a four-masted barque of 1931. Rig unstepped and surveyed, teak lifted and relaid, propulsion and steering returned to class.

TODAY
WHERE THE LINE HAS REACHED

Eighteen hulls on the register, and three of them on the hard this morning.

0
PROJECTS ON THE REGISTER

Every hull opened, rebuilt and handed back, plus the three still in the sheds.

0
LARGEST REDELIVERED

Grand Rusalina, 2024 — four and a half of her six months in dry dock.

0
LONGEST YARD STAY

Saadet Sultan, 2017 — a 1989 hull taken apart and put back together.

0
REDELIVERED IN 2024

Grand Rusalina, Solaris, Zima and Hayat, inside twelve months.

Timber battens stacked against the shed wall

THE NEXT ENTRY

Eighteen entries so far. The next one is a berth away.

READ ABOUT REVIVA
{{ menuNum }} {{ menuCaption }}
GET IN TOUCH info@revivarefit.com
THE YARD Evliya Çelebi Mah. Tersaneler Cad.
No 6, Tuzla, Istanbul
2015 {{ t.year }} TODAY
PROJECT HISTORY EVERY HULL, IN ORDER

{{ c.t }}

SCROLL TO WIND IT BACK
M/Y Y, the first yacht on the Reviva refit register, after her 2015 refit
REWINDING 2026
TUZLA · 2015 This is where the register starts.
{{ e.range }} {{ e.name }}
{{ m.title }}
{{ m.meta }} {{ m.year }}

{{ m.title }}

{{ m.body }}

TODAY
WHERE THE LINE HAS REACHED

Eighteen hulls on the register, and three of them on the hard this morning.

0
{{ st.label }}

{{ st.note }}

Timber battens stacked against the shed wall

THE NEXT ENTRY

Eighteen entries so far. The next one is a berth away.

READ ABOUT REVIVA