S/Y Beluga (ex.Shipowner)

layer-1
Layer 7

R04

Project Code

2017

Refit Year

34m

Length

Refit

Type

STORY

Year-Long Yacht Refit Services Duration: Over 12 months, our team meticulously refitted the yacht, enhancing its functionality and luxury.

Key Services Provided:

  1. Structural and Mechanical Enhancements:
    • Aft Platform Transformer: A new transformer was installed on the aft platform to improve electrical management and functionality.
    • Engine and Generator Servicing: Comprehensive servicing of the main engine and generator was conducted to ensure optimal performance and reliability.
  2. Interior Upgrades:
    • Sauna Installation: A luxurious sauna was installed in the master cabin, providing a private and relaxing retreat.
    • Galley Furniture Renewal: The galley furniture was renewed, enhancing the cooking and dining experience onboard.
  3. Aesthetic and Maintenance Improvements:
    • Hull and Superstructure Painting: Fresh paint was applied to the hull and superstructure, restoring the yacht’s pristine appearance and providing durable protection.
    • Deck Teak Renewal: The teak on the deck was renewed, ensuring both durability and aesthetic appeal.
    • Chrome Polishing: All chrome equipment was polished to a high shine, enhancing the yacht’s overall look and feel.

Summary: During this extensive 12-month refit, our expert team focused on significant upgrades and maintenance tasks to elevate the yacht’s luxury and performance. From installing a sauna in the master cabin, renewing the galley furniture, servicing the main engine and generator, and repainting the hull and superstructure, every detail was meticulously attended to. These enhancements ensure the yacht is ready for a new season of luxurious and reliable sailing.

DIMENSIONS & MATERIALS

LENGTH (LOA)

34m ( 2m extended)

BEAM

7.80ms

DRAFT

1.28m

GROSS TONNAGE

160T

CONSTRUCTION MATERIAL

Wooden Epoxy Laminated

CONSTRUCTION & DESIGN

BUILT / REFIT

2003 / 2017

BUILDER

Mengi Yay

FORMER NAME

Shipowner

NAVAL ARCHITECT

Mengi Yay

EXTERIOR DESIGNER

Mengi Yay

INTERIOR DESIGNER

Mengi Yay

Refit Specification

Former Name:

S/Y Beluga (ex.Shipowner)

Reviva Refit Years:

2017

Refit Location:

Marmaris

Stay Duration:

12 months

BEFORE & AFTER

Explore the before and after effect of the refit.
DSC_0077IMG_5296

GENERAL ARRANGEMENT

Take a look at the general arrangement plan of the yacht
Scroll to Top