M/Y Y (ex. Reina Pol)

layer-1
Layer 7

R01

Project Code

2015

Refit Year

32m

Length

Refit

Type

STORY

Fall Yacht Refit Services (12 Months) Duration: During the fall, our team meticulously refitted and upgraded the yacht over a period of 12 months, focusing on both aesthetics and functionality.

Key Services Provided:

  1. Hull and Structural Enhancements:
    • Hull and Superstructure Painting: The entire hull and superstructure were repainted, giving the yacht a refreshed and pristine appearance.
  2. Interior and Exterior Upgrades:
    • New Furniture Designs: Custom furniture designs were created and installed for the saloon and cabins, enhancing the yacht’s interior elegance and comfort.
    • Local Teak Deck Replacements: Specific sections of the teak deck were replaced to maintain durability and aesthetic appeal.
  3. Technical and Mechanical Improvements:
    • Crane Maintenance: Comprehensive maintenance was performed on the crane located on the flybridge to ensure its optimal operation.
  4. Galley and Interior Design:
    • New Galley Design: A new galley design was adapted to fit seamlessly within the yacht, enhancing the culinary experience onboard.
    • Interior Furniture Installation: New interior furniture was designed, produced, and installed, modernizing the yacht’s living spaces.

Summary: During this extensive 12-month refit, our expert team focused on significant upgrades to the yacht’s appearance and functionality. From a complete repaint of the hull and superstructure to the installation of new custom-designed furniture and a revamped galley, every detail was attended to precisely. These enhancements ensure that the yacht is more luxurious and better equipped for a comfortable and enjoyable sailing experience.

DIMENSIONS & MATERIALS

LENGTH (LOA)

32.00m

BEAM

7.05m

DRAFT

1.4m

GROSS TONNAGE

200T

CONSTRUCTION MATERIAL

Wooden Epoxy Laminated

CONSTRUCTION & DESIGN

BUILT / REFIT

2011 / 2015

BUILDER

Mengi Yay

NAVAL ARCHITECT

Mengi Yay

EXTERIOR DESIGNER

Mengi Yay

INTERIOR DESIGNER

Guido de Groot Design

Refit Specification

Former Name:

M/Y Y (ex. Reina Pol)

Reviva Refit Years:

2015

Refit Location:

Mengi Yay

Stay Duration:

12 months