Winter Yacht Refit Services (8 Months) Duration: Our team meticulously worked on the yacht for an extensive 8-month period during the winter, ensuring every detail was attended to.

Key Services Provided:

  1. Hull and Structural Enhancements:
    • Hull Painting: The entire hull and superstructure were repainted to restore their pristine condition.
    • New Hardtop Installation: The roll bar was replaced with a new hardtop designed to enhance the yacht’s aesthetics and functionality.
  2. Interior and Exterior Upgrades:
    • Interior Redesign: The interior design was completely renewed, including updated varnish on furniture and walls.
    • Bathroom Redesign: All bathrooms received a fresh design, improving both style and comfort.
    • Exterior Furniture Covers: Custom covers were produced for exterior furniture, ensuring protection and durability.
    • Bar Counter Replacement: The bar counter was upgraded with Corian, providing a sleek and modern look.
    • TV Lift Connection: Installed and connected a new TV lift system.
  3. Mechanical and Technical Improvements:
    • Water Maker Installation: A new water maker was installed to enhance the onboard water supply.
    • Chrome Tank Installation: A custom chrome tank was manufactured and installed.
    • Bilge and Garage Repainting: The bilge was sanded and repainted, and the garage paint was renewed.
  4. Detailing and Finishing Touches:
    • Sikaflex Renewal: Sikaflex was renewed in necessary areas to ensure seals and joints are in top condition.
    • Porthole Design Update: The portholes’ design was refreshed to match the yacht’s modernized look.

 

Summary: During this comprehensive winter refit, our expert team performed extensive upgrades and maintenance tasks to rejuvenate the yacht’s appearance and functionality. From repainting the hull and superstructure to installing a new hardtop and renewing the interior design, we ensured the yacht was prepared for a new season of luxury and performance.

 

DIMENSIONS & MATERIALS

LENGTH (LOA)

34.70m

BEAM

7.0m

DRAFT

1.28m

DISPLACEMENT

115T

GROSS TONNAGE

201T

CONSTRUCTION MATERIAL

Wooden Epoxy Laminated

CONSTRUCTION & DESIGN

BUILT / REFIT

2005 / 2018

BUILDER

Mengi Yay

NAVAL ARCHITECT

Mengi Yay

EXTERIOR DESIGNER

Mengi Yay

INTERIOR DESIGNER

BTA DESIGN

Refit Specification

Former Name:

M/Y Belvedere

Reviva Refit Years:

2018

Refit Location:

Mengi Yay

Stay Duration:

8 months