IV · FLEET M/Y Mirabella, redelivered
THE YARD Evliya Celebi Mah. Tersaneler Cad.
Mengi Yay, Tuzla, Istanbul
← THE REGISTER PROJECT R15 · REDELIVERED 15 JULY 2026

Mirabella

A 47.9-metre Trinity, built 2004, taken back to substrate across paint, systems, joinery and exterior living areas — and handed back in eight and a half months, to the day agreed at contract.

47.9 m LENGTH OVERALL MONTHS IN YARD 2004 TRINITY YACHTS R15 PROJECT CODE

Four trades, one winter, one fixed date.

Mirabella arrived in Tuzla in mid-September 2025 and was hauled out in early October. Paint, electrical and electronic systems, interior joinery and structural work on the transom all ran inside the same winter — against a redelivery date of 15 July 2026 fixed at contract signature and held to.

Rob Dolling of Verpeka Dolling Superyachts acted throughout as Owner's Representative and Owner's Technical Manager, carrying responsibility for quality, technical integrity and the date. R15 is the fifteenth major refit the yard has taken on since 2017, and among the widest in scope.

MID-SEPTEMBER 2025 Arrival, Tuzla Alongside for survey and scope confirmation against the contract package.
EARLY OCTOBER 2025 Hauled out Out of the water for paint preparation, transom work and running gear.
WINTER 2025–26 Four trades in parallel Paint, electrical and electronics, joinery and structural work run at once, not in series.
15 JULY 2026 Redelivered The date agreed at contract signature, held to across the whole programme.
BEFORE & AFTER — IN PROFILE

The repaint is best read from off the transom.

DRAG THE HANDLE
AFTER · JULY 2026
BEFORE · SEPTEMBER 2025

Hull and superstructure were stripped and fully repainted in climate-controlled conditions — the single change that resets how a twenty-two-year-old hull reads on the water.

New railings, new entrance glass, an engraved family crest and a redrawn name and logo were produced and fitted in-house, so the details match the new finish rather than survive it.

ROOM BY ROOM

Open any space and slide between the two states.

05 SPACES DOCUMENTED
THE WORK, IN DETAIL FOUR DISCIPLINES, ONE WINTER
01

Paint & structure

HULL · SUPERSTRUCTURE · TRANSOM

Hull and superstructure were stripped and fully repainted in climate-controlled conditions — the change that resets how a 2004 aluminium hull reads on the water. In the same programme the transom area was structurally revised to take an integrated transformer at the swim platform, with a dedicated watertight chamber built to house it.

Full exterior repaint of hull and superstructure Climate-controlled preparation and application Structural revision to the transom area Dedicated watertight chamber for the transformer New railings, new entrance glass, engraved family crest Logo and name design, production and installation
02

Systems & light

ELECTRICAL · ELECTRONICS · MECHANICAL

The electrical and electronic infrastructure was substantially renewed — audio-visual systems, bridge electronics, and a complete rethink of interior lighting alongside significantly enhanced exterior deck lighting. Mechanical work ran in parallel: stabiliser overhaul, main engine maintenance and replacement of the generator exhaust outlet scoop.

Electrical and electronic infrastructure renewed AV systems and bridge electronics Interior lighting redesigned Exterior deck lighting significantly enhanced Stabiliser overhaul; main engine maintenance Generator exhaust outlet scoop replaced
03

Joinery & interior

VENEER · UPHOLSTERY · MARBLE

Twenty-two years of sun, salt and humidity had dulled the varnished joinery to a cloudy haze. The affected veneers were taken back to bare wood, sanded, and re-finished in a new walnut — chocolate tone under controlled conditions: a deliberately labour-intensive route chosen to preserve the character of Scott Carpenter's original interior rather than mask it.

Varnished woodwork stripped, sanded and re-finished throughout New walnut — chocolate tone New upholstery; furniture refreshed or replaced Interior floor replacement and marble installation Complete galley renewal
04

Deck & exterior living

SUNDECK · SEATING · TEAK

The most visible changes are on deck. A bespoke Jacuzzi was installed on a redesigned sundeck, new exterior seating areas were created across all decks, and exterior marble was replaced with a teak border. Teak renewals ran across the yacht, so the surfaces underfoot match the standard of the repaint above them.

Bespoke Jacuzzi on a redesigned sundeck New exterior seating areas across all decks Exterior marble replacement with teak border Teak renewals Swim platform reconfigured with integrated transformer
“You can judge a yard by what it takes on in one winter. R15 asked for paint, systems, joinery and structural work at once, to a date we had committed to, and our people carried all four across the line together. Mirabella left Tuzla genuinely transformed — that is why Reviva exists.”
RAMAZAN MENGI REFIT OPERATIONS, REVIVA / MENGI YAY
“The scope on Mirabella touched almost every technical discipline onboard simultaneously. Mengi Yay's direct access to specialised trade resources — from marine electrical and mechanical teams to interior joiners — allowed us to address a wide range of complex works within a single winter period.”
ROB DOLLING VERPEKA DOLLING SUPERYACHTS · OWNER'S REPRESENTATIVE & TECHNICAL MANAGER

Scope of works, as delivered.

01 Full exterior repaint of hull and superstructure in climate-controlled conditions 02 Renewal of electrical and electronic infrastructure, including AV and bridge systems 03 Redesigned interior lighting and substantially enhanced exterior deck lighting 04 Varnished woodwork stripped, sanded and re-finished throughout the interior 05 Mechanical overhaul: stabiliser overhaul, main engine maintenance, generator exhaust scoop replaced 06 New upholstery; furniture refreshed or replaced across guest and owner areas 07 Bespoke Jacuzzi installed on a redesigned sundeck 08 Logo and name design, production and installation 09 Interior floor replacement and marble installation 10 Exterior marble replacement with teak border 11 New railings, new entrance glass and family crest logo engraving 12 Complete galley renewal 13 Teak renewals 14 New exterior seating areas created across all decks 15 Swim platform reconfigured with integrated transformer, structural revision to the transom and a dedicated watertight chamber

Key specifications

She accommodates eleven guests across five staterooms — four with king berths, one twin with a Pullman — and carries a crew of nine. Mirabella now returns to the Mediterranean.

BUILDER Trinity Yachts (United States), 2004 LENGTH OVERALL 47.9 m (157 ft 2 in) BEAM 8.51 m DRAFT 2.36 m GROSS TONNAGE 465 GT HULL / TYPE Aluminium, semi-displacement NAVAL ARCHITECTURE & EXTERIOR Trinity Yachts INTERIOR DESIGN (ORIGINAL) Scott Carpenter GUESTS / STATEROOMS 11 guests in 5 staterooms CREW 9 MAIN ENGINES 2 × Caterpillar 3512B, 2,250 hp each SPEED / RANGE 18 kn max; 12 kn cruise; 3,500 nm @ 12 kn REFIT Reviva — Project R15, 2025–2026
← EVERY HULL WE HAVE HANDED BACK The Register WHAT IS OPEN NOW → In the Yard
{{ menuNum }} {{ menuCaption }}
THE YARD Evliya Celebi Mah. Tersaneler Cad.
Mengi Yay, Tuzla, Istanbul
← THE REGISTER PROJECT R15 · REDELIVERED 15 JULY 2026

Mirabella

A 47.9-metre Trinity, built 2004, taken back to substrate across paint, systems, joinery and exterior living areas — and handed back in eight and a half months, to the day agreed at contract.

{{ h.v }} {{ h.k }}

Four trades, one winter, one fixed date.

Mirabella arrived in Tuzla in mid-September 2025 and was hauled out in early October. Paint, electrical and electronic systems, interior joinery and structural work on the transom all ran inside the same winter — against a redelivery date of 15 July 2026 fixed at contract signature and held to.

Rob Dolling of Verpeka Dolling Superyachts acted throughout as Owner's Representative and Owner's Technical Manager, carrying responsibility for quality, technical integrity and the date. R15 is the fifteenth major refit the yard has taken on since 2017, and among the widest in scope.

{{ t.when }} {{ t.what }} {{ t.note }}
BEFORE & AFTER — IN PROFILE

The repaint is best read from off the transom.

DRAG THE HANDLE
AFTER · JULY 2026
BEFORE · SEPTEMBER 2025

Hull and superstructure were stripped and fully repainted in climate-controlled conditions — the single change that resets how a twenty-two-year-old hull reads on the water.

New railings, new entrance glass, an engraved family crest and a redrawn name and logo were produced and fitted in-house, so the details match the new finish rather than survive it.

ROOM BY ROOM

Open any space and slide between the two states.

{{ roomCount }} SPACES DOCUMENTED
{{ frameLabel }} {{ room.name }}
AFTER
BEFORE

{{ room.body }}

{{ w.t }}
{{ albumName }} — ALL FRAMES
THE WORK, IN DETAIL FOUR DISCIPLINES, ONE WINTER
{{ c.num }}

{{ c.name }}

{{ c.tag }}

{{ c.body }}

{{ it.t }}
{{ q.text }}
{{ q.who }} {{ q.role }}

Scope of works, as delivered.

{{ s.n }} {{ s.t }}

Key specifications

She accommodates eleven guests across five staterooms — four with king berths, one twin with a Pullman — and carries a crew of nine. Mirabella now returns to the Mediterranean.

{{ sp.k }} {{ sp.v }}
← EVERY HULL WE HAVE HANDED BACK The Register WHAT IS OPEN NOW → In the Yard