What follows is the record as the yard kept it — the scope of work, the specification, and the yacht as she left us.
Over 7 months during the fall, our team undertook a comprehensive refit, enhancing the yacht’s interior and exterior.
Interior Varnish Renewal: The varnish on all interior furniture was renewed, restoring its original shine and protecting the wood.
The interior wall and ceiling coverings were replaced, giving the yacht a refreshed and modern look.
New Exterior Furniture: Custom-designed furniture for the main deck was produced and installed, enhancing the yacht's outdoor living spaces.
Wiper Replacement: New wipers were installed for better visibility and safety.
Hydraulic leaks were repaired to ensure smooth and safe operation of hydraulic systems.