MY Grand Rusalina

layer-1
Layer 7

R11

Project Code

2024

Refit Year

60m

Length

Refit

Type

STORY

Duration: Over a 6-month period during the winter, including 4.5 months in dry dock, our team executed an extensive refit to enhance both performance and aesthetics.

Key Services Provided:

  1. Technical and Mechanical Refitting:
    • Propulsion and Thrusters: Service included dismantling, cleaning, testing, and re-installing main propellers and stern thrusters. Prop speed coating was applied for optimal performance.
    • Cooling Systems: Keel coolers were chemically cleaned, pressure tested, and coolant was replaced, ensuring efficient engine cooling.
    • Shaft and Bearing Checks: Main propeller shafts were inspected for cracks and alignment, ensuring reliability and smooth operation.
  2. Painting and Surface Treatments:
    • Hull and Superstructure: Touch-up painting and mechanical polishing of the propeller blades were performed to improve both appearance and performance.
  3. Plumbing and Waterproofing:
    • Valves and Pumps: Installation and replacement of non-return valves, sea water intake valves, and freshwater ball valves to ensure robust plumbing systems.
  4. Interior Upgrades:
    • Appliance Servicing: Comprehensive service of washing and drying machines, including replacement of essential components.
    • Upholstery Replacement: In cabins, old upholstery was replaced with new, high-quality materials approved by the owner.
  5. Safety and Compliance Inspections:
    • Rudder Inspections: Both starboard and portside rudders were dismantled, inspected, and tested to meet safety standards.
    • Clearance Measurements: Detailed inspections and measurements of rudder stock and bearings were conducted to ensure operational integrity.
  6. Documentation and Reporting:
    • Detailed reports in English, including photos and drawings, were prepared for the owner’s representative and relevant surveyors, ensuring transparency and adherence to quality standards.
  7. Conclusion:
    • This refit session focused on thorough technical upgrades, aesthetic enhancements, and ensuring the yacht’s compliance with safety standards. 
ACCOMMODATION

GUESTS

19

STATEROOMS

8

CREW

16

CONSTRUCTION & DESIGN

BUILT / REFIT

2006 / 2018 / 2023 / 2024

BUILDER

Trinity Yachts

EXTERIOR DESIGNER

Felham Enterprises

INTERIOR DESIGNER

Smith Marine Interiors

DIMENSIONS & MATERIALS

LENGTH (LOA)

60m (195’06”)

BEAM

11.44m (37’06”)

DRAFT

3.1m (10’02”)

GROSS TONNAGE

966 GT

DISPLACEMENT

1100 tonees

HULL MATERIAL

Steel

PERFORMANCE & ENGINES

CRUISING SPEED

12 Knots

BUILDER

15 Knots

CRUISE RANGE

6,000 nm

RANGE

6,500 nm

ENGINES

2 x Caterpillar (1,500 hp) 

GENERATORS

2 x Caterpillar (380kW)

1 x Northern Lights (99kW)

CLASS & FLAG

CLASSIFICATION

Lloyd’s Register (LR)

FLAG STATE

Cayman Islands

FEATURES
STABILISERS
Quantum At Anchor & Underway
Refit Specification

Former Name:

MY_Grand Rusalina

Reviva Refit Years:

2023 / 2024

Refit Location:

Mengi Yay, Tuzla

Stay Duration:

6 month

BEFORE & AFTER

Explore the before and after effect of the refit.
TGO_9413TGO_9446

GENERAL ARRANGEMENT

Take a look at the general arrangement plan of the yacht
Scroll to Top