Fall Yacht Refit Services (4 Months) Duration: Over four months during the fall, our team executed a comprehensive refit, focusing on painting and structural enhancements.

Key Services Provided:

  1. Structural Enhancements:
    • Deck Extension: The existing platform was extended, providing additional space and enhancing the yacht’s functionality.
    • Elevator Installation: An elevator was added to the interior, improving accessibility and convenience for all guests.
  2. Hull and Superstructure Painting:
    • Painting: Fresh paint was applied to the hull and superstructure, restoring the yacht’s pristine appearance and ensuring long-lasting protection.
  3. Interior Modifications:
    • Master Cabin Furniture Changes: Localized changes were made to the furniture in the master cabin to enhance comfort and aesthetics.

Summary: During this focused four-month fall refit, our expert team performed significant structural enhancements and aesthetic upgrades. From extending the deck and installing an interior elevator to repainting the hull and superstructure and updating the master cabin furniture, these improvements ensured the yacht was more luxurious, functional, and ready for new adventures.

 

DIMENSIONS & MATERIALS

LENGTH (LOA)

27.0m

BEAM

6.6m

DRAFT

3.33m

GROSS TONNAGE

190T

CONSTRUCTION MATERIAL

Wooden Epoxy Laminated

CONSTRUCTION & DESIGN

BUILT / REFIT

2015 / 2020

BUILDER

Mengi Yay

FORMER NAME

Seleda

NAVAL ARCHITECT

Mengi Yay

EXTERIOR DESIGNER

Mengi Yay

INTERIOR DESIGNER

BTA DESIGN

Refit Specification

Former Name:

M/Y Iceberg (ex. Seleda)

Reviva Refit Years:

2020

Refit Location:

Mengi Yay

Stay Duration:

4 months